November 17, 2018 Construction Update

30 November 2018 |

Formwork for the roof of building eight has been installed and work on completing the roof is ongoing. Casting of the ground floor, as well as blockwork in the first and second floor continues. Steel columns for the roofs of building’s seven and nine have also been erected and are being casted. Steel columns to the roof of building ten are also been erected. In general, blockwork continues in all of the buildings being constructed, with plastering being done on specific floors of each building. The formwork for the retaining wall behind building’s six and seven have been created and preparations are being made to cast the foundation.

 

 